NEW QUESTION 18
How can you limit the number of master data objects to be created when the manufacturing process is the same for many different products?
Please choose the correct answer.
Response:
- A. By assigning different materials to the same routing
- B. By creating routings with parallel sequences
- C. By assigning the same production version to different materials
- D. By creating routings with alternative sequences
Answer: A
NEW QUESTION 19
During production order creation, several valid production versions are found. How does the system choose the product conversion?
- A. Validity period or sales order
- B. Planned order or material number
- C. Alphanumeric or quota arrangement
- D. Lot size or material cost
Answer: C
NEW QUESTION 20
Which of the following are included as SAP S/4HANA Sales Simplifications?
There are 3 correct answers to this question.
Response:
- A. Settlement Management replaces ERP SD Rebates
- B. SAP GTS replaces ERP SD Foreign Trade
- C. SAP Revenue Accounting replaces ERP SD Revenue Recognition
- D. SAP Sales Support replaces SAP CRM
- E. SAP order Fulfillment replaces ERP SD Availability Checking
Answer: A,B,C
NEW QUESTION 21
What steps are possible in a PP/DS production planning run?
There are 3 correct answers to this question.
Response:
- A. Heuristics
- B. Optimization
- C. Detailed scheduling functions
- D. Backorder processing
- E. Demand consumption
Answer: A,B,C
NEW QUESTION 22
For which data objects do you have to set up CIF integration models in S/4HANA to use them in advanced planning?
There are 2 correct answers to this question.
Response:
- A. Work center
- B. Material master
- C. Contract
- D. Production plant
Answer: C,D
NEW QUESTION 23
To ensure that the warehouse operator only stages large components in the exact required quality for each production order, which warehouse material staging method would you recommend?
Please choose the correct answer.
Response:
- A. Pick parts
- B. Kanban
- C. Release order parts
- D. Crate parts
Answer: A
NEW QUESTION 24
If the stock level drops below the reorder stock in reorder point planning, what is the system logic to trigger procurement?
- A. Fill up to the reorder stock level
- B. Fill up to the safety stock level
- C. Fill up based on the lot size procedure
- D. Fill up to the maximum stock level
Answer: C
NEW QUESTION 25
You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created?
Please choose the correct answer.
Response:
- A. Quota arrangement
- B. Delivery date
- C. Costs
- D. Component availability
- E. Vendor rating
Answer: A
NEW QUESTION 26
What are main innovations in manufacturing in SAP S/4HANA?
There are 3 correct answers to this question.
Response:
- A. Monitor Production Orders Fiori app
- B. Rough-cut capacity planning
- C. Flow manufacturing
- D. Material Coverage Fiori app
- E. Lock-free inventory movements
Answer: A,D,E
NEW QUESTION 27
The material master of your finished product contains MRP type "PD". You set a manual firming date in the stock requirements list. Which of the following will firm planned orders" There are 2 correct answers to this question.
Response:
- A. Manually changing the quantity of a planned order
- B. Creating a planned order within the planning time fence
- C. Assigning a production scheduling profile
- D. Setting a planning time fence in the Material Master Record
Answer: B,D
NEW QUESTION 28
What determines whether the planned independent requirements in MRP consume other requirements?
- A. Requirements profile
- B. Order type
- C. Consumption sequence procedure
- D. Requirements type
Answer: D
NEW QUESTION 29
In which material master views can you select the batch management checkbox?
There are 2 correct answers to this question.
Response:
- A. Work Scheduling
- B. Basic Data 1
- C. MRP 4
- D. Purchasing
Answer: A,D
NEW QUESTION 30
In which data object is the production line (Repetitive manufacturing relevant work center) maintained?
Please choose the correct answer.
Response:
- A. Cost collector
- B. Repetitive manufacturing profile
- C. Bill of material
- D. Production version
Answer: D
NEW QUESTION 31
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?
- A. The cross-plant status
- B. The least restrictive status
- C. The most restrictive status
- D. The plant-specific status
Answer: C
NEW QUESTION 32
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.
- A. Adjust the available capacity.
- B. Execute a new production planning run.
- C. Select an alternative mode on a resource.
- D. Reduce the planning window.
- E. Form optimum sequences to reduce setup times.
Answer: A,C,E
NEW QUESTION 33
What are attributes of the SAP S/4HANA Simplification list?
There are 3 correct answers to this question.
Response:
- A. It is only a grouping of related technical simplifications
- B. It was created for better planning and estimation of your way to S/4HANA
- C. It can have a business and a technical impact
- D. It details transaction and solution capabilities at a functional level
- E. It contains references to the relevant training material
Answer: B,C,D
NEW QUESTION 34
Which time elements are relevant for lead t me scheduling of a product on order? Note: There are 2 correct answers to this question.
- A. Float after production
- B. Planned delivery time
- C. Setup time
- D. Total replenishment lead time
Answer: A,B
NEW QUESTION 35
......