NEW QUESTION # 344
uses the economic-order-quantity formula to calculate an economic time between orders.
- A. inventory-carrying-order quantity
- B. production-order quantity
- C. All of the above
- D. period-order quantity
Answer: D
NEW QUESTION # 345
The inputs needed for a capacity requirement plan are open shop orders, planned order releases, routings, time standards and work center capacities, this all information can be obtained from:
- A. Open order file
- B. Routing file
- C. Material Requirements Plan
- D. All of the above
Answer: D
NEW QUESTION # 346
The immediate or most current period is called
- A. Both a & B
- B. Time buckets
- C. Action bucket
- D. Planning horizon
Answer: C
NEW QUESTION # 347
What have most of the values clustered near a central point with progressively fewer results occurring away from the cluster?
- A. Frequent distribution
- B. Normal distribution
- C. Relevant distribution
- D. Average distribution
Answer: B
NEW QUESTION # 348
Planning bills are used to:
- A. Material requirements planning
- B. Master production scheduling
- C. Simplify forecasting
- D. All of the above
Answer: D
NEW QUESTION # 349
Inventory records data are maintained in:
- A. Part master file
- B. Item master file
- C. All of the above
- D. Inventory record file
Answer: C
NEW QUESTION # 350
If the product or service is ready for the customer's use at the time of sale, this refers to:
- A. Implementation
- B. Usability
- C. Accomplishment
- D. Performance
Answer: D
NEW QUESTION # 351
The information needed to make a production plan is:
- A. Any past-due customer orders. These are orders that are late for delivery and are sometimes back orders.
- B. All of these
- C. Forecast by period for the planning horizon
- D. Opening inventory and desired ending inventory
Answer: B
Explanation:
Example:
Amalgamated Fish Sinkers makes a product group of fresh fish sinkers and want to develop a production plan for them. The expected opening inventory is 100 cases, and the company wants to reduce that to 80 cases by the end of the planning period. The number of working days is the same for each period. There are no back orders. The expected demand for the fish sinkers is as follows:
NEW QUESTION # 352
Which one of the following is NOT done by PAC in control phase?
- A. Track the actual performance of work orders and compare it to planned schedules.
- B. Report work center efficiency, operation times, order quantities and scrap.
- C. Ensure that required materials, tooling, personnel and information are available.
- D. Monitor and control work-in-process, lead times, and work center queues.
Answer: C
NEW QUESTION # 353
The annual cost and effort expended in orders placed, not on the quantity ordered.
- A. Capacity control
- B. Purchase order cost
- C. Production control
- D. Set-up control
Answer: C
NEW QUESTION # 354
Raw materials that have entered the manufacturing process and are being worked on or waiting to be worked on, are:
- A. Coming up-process
- B. Future-process
- C. Work-in-process
- D. Waiting-process
Answer: C
NEW QUESTION # 355
is the number of periods 1, in which changes are not expected due to excessive cost caused by schedule disruption.
- A. ATP (available o promise)
- B. Projected available balance
- C. Demand time fence
- D. Scheduled receipt
Answer: C
NEW QUESTION # 356
The safety stock required depends on which of the following:
- A. Frequency of reorder
- B. Variability of demand during the lead time
- C. Service level desired
- D. All of the above
Answer: D
NEW QUESTION # 357
A structured approach to organize the operation for more effectiveness and less waste that is the overall goal of a lean production system includes which 5S?
- A. Species, straighten, shine, standardize, sustain
- B. Sort, straighten, shine, standardize, sustain
- C. Sort, straighten, shine, standardize, suspect
- D. Sort, strong, shower, standardize, sustain
Answer: B
NEW QUESTION # 358
____________________ are concerned with the end use of the item and what the item is expected to do.
- A. Price requirements
- B. Performance requisition
- C. Quality assurance
- D. Functional specifications
Answer: D
NEW QUESTION # 359
* Pareto charts
* Check sheets
* Process flowcharts
* Sactterplots
* Cause and effect diagram
These are the:
- A. Quality control tools
- B. None of these
- C. demand measurements
- D. Control charts
Answer: B
NEW QUESTION # 360
A difference between the physical count and inventory dollars for the inventory records is called:
- A. Reconciliation
- B. Accuracy
- C. Resolution
- D. Provocation
Answer: A
NEW QUESTION # 361
A system that forecasts when the various demands will be made by the system on central supply is known as:
- A. Anticipated centralized system
- B. Distribution requirements planning
- C. Predictive central system
- D. Conjecture supply planning
Answer: B
NEW QUESTION # 362
Showing the scope of the quality management system is known as:
- A. policy
- B. plan
- C. practice
- D. procedure
Answer: A
NEW QUESTION # 363
* High quality level
* High flexibility to change such things as volume, specifications, and delivery
* High service level
* Short lead times
* Low variability in meeting targets
* Low cost
These are general requirements of:
- A. Sub-contractors
- B. Suppliers
- C. All the supply chain agents
- D. Customers
Answer: B
NEW QUESTION # 364
......
APICS Dumps - Learn How To Deal With The Exam Anxiety: https://www.prep4king.com/CPIM-exam-prep-material.html