NEW QUESTION 110
Your customer needs to downgrade the firmware on a number of blades because they experienced issues with the current firmware. The customer modifies the server profile to the required firmware baseline and selects update, but the firmware downgrade is not successful.
What step needs to be taken to ensure the firmware downgrade is applied?

  • A. Create and assign a new server profile for the affected servers
  • B. Contact HPE support to obtain a one-time password to enable firmware downgrade
  • C. Select the "Force installation" option to downgrade the firmware
  • D. Set the firmware baseline to "Managed Manually"

Answer: C

 

NEW QUESTION 111
How is single sign-on implemented between HPE oneview and HPE Blade system onboard Administrator?

  • A. LDAP/AD integration is automatically configured in HPE Blade System onboards administrator.
  • B. An HPE OneView appliance certificate is installed to HPE Blade System onboard administrator.
  • C. An hPE Oneview appliance certificate is instaklled on the iLO of the server in bay 1.
  • D. Verification of federated session is configured in HPE Blade Syem onboard Administrator.

Answer: B

 

NEW QUESTION 112
A systems administrator needs to add a VLAN to a network set to support a new application. They have added the network to the upstream switch and the Logical Interconnect Group in HPE OneView but traffic is not passing. What is the most likely cause of the problem?

  • A. Intelligent Management Center (IMG) has not been updated via REST.
  • B. The administrator needs to update the Logical Interconnects from the Logical Interconnect Group.
  • C. The upstream switch doesn't have the VLAN enabled.
  • D. The administrator failed to update the state change message bus.

Answer: C

 

NEW QUESTION 113
A customer would like to apply a server profile to the server in the exhibit. What is the first action they must take to successfully apply the server profile?

  • A. Click on the create profile hyperlink.
  • B. Click on the server hardware type.
  • C. Apply the correct HPE OneView license
  • D. Power off the server

Answer: D

 

NEW QUESTION 114
Which resource categories can be included in a scope? (Choose two.)

  • A. firmware bundles
  • B. racks
  • C. data centers
  • D. enclosures

Answer: A,B

 

NEW QUESTION 115
A customer has an environment including HPE ProLiant DL servers and HPE 3PAR storage arrays. They are planning to provision storage using HPE OneView.
Which licensing configuration will meet the customer needs?

  • A. An HPE 3PAR Virtual Domain License must be activated on the HPE 3PAR storage array.
  • B. An FC Upgrade License is required for every HPE server to enable FC connectivity.
  • C. An HPE OneView Advanced License is required for every HPE server with provisioned storage.
  • D. An HPE 3PAR Online Import License must be enabled on the HPE 3PAR storage array.

Answer: C

Explanation:
Explanation/Reference:

 

NEW QUESTION 116
In HPE OneView, which server profile attributes are configurable on HPE ProLiant server blades but not on HPE ProLiant rack servers? (Choose two.)

  • A. Local storage
  • B. BIOS settings
  • C. FlexNICs and FlexHBAs
  • D. SAN storage
  • E. Boot order

Answer: C,D

 

NEW QUESTION 117
What is the recommended process order for configuring a c-Class BladeSystem in HPE OneView?

Answer:

Explanation:

 

NEW QUESTION 118
You decide to take advantage of HPE OneView's ability to virtualize unique identifiers. Which physical hardware identifiers are you able to virtualize? (Choose two.)

  • A. interconnect serial number
  • B. MAC address
  • C. CPU serial number
  • D. enclosure serial number
  • E. World Wide Name

Answer: B,E

 

NEW QUESTION 119
A server administrator needs to expand a VMware vSphere farm and use an already existing server profile as a baseline. Click the area where new server profile templates can be created from a selected server profile.

Answer:

Explanation:

 

NEW QUESTION 120
Refer to the exhibit.

A solution architect is setting up a Synergy configuration for a customer. The customer wants their redundancy level to be Highly Available. What is preventing this option from being available for the customer?

  • A. Synergy doesn't support an HA fabric configuration on the Virtual Connect SE 40GB F8 module for Synergy.
  • B. HA is not supported in Interconnect Bay set 3.
  • C. HA is only supported in mixed speed environments.
  • D. HA requires multiple frames in the fabric domain.

Answer: D

 

NEW QUESTION 121
Match the HPE OneView interconnect module state to its definition. (Not all states will be used.)

Answer:

Explanation:

Explanation

 

NEW QUESTION 122
Which components are required for a production HPE Image Streamer deployment? (Choose two.)

  • A. a Deployment Network
  • B. HPE Apollo servers
  • C. automatic SAN zoning
  • D. OneView Global Dashboard
  • E. multiple frames

Answer: A,E

 

NEW QUESTION 123
Which statement is true about consistency checks between the server profile template and its corresponding server profiles?

  • A. Server profiles can combine consistency checks from multiple server profile templates
  • B. A server profile must always fulfill the minimum specifications jn its server profile template.
  • C. You can have different consistency checking levels within a server profile.
  • D. Consistency checking is enabled for a complete server profile.

Answer: C

 

NEW QUESTION 124
You have a new HPE BladeSystem C7000 enclosure to add to your existing HPE OneView appliance as a managed resource. What is the proper PowerShell Cmdlet to achieve this task?

  • A. Add-HPOVServer -Hostname 192.122.8.189 -Username Administrator -Password MyP@ssw0rd
  • B. Add-HPOVPowerDevice -Hostname 192.168.1.100 -Username admin -Password MyP@ssw0rd
  • C. New-HPOVLogicalEnclosure -Name 192.122.8.189
  • D. Add-HPOVEnclosure -Hostname 192.168.1.100 -Username Administrator -Password MyP@ssw0rd

Answer: D

 

NEW QUESTION 125
A server that is managed by HPE OneView is having issues, and HPE support has requested that you reapply the server profile. What action must first be executed?

  • A. Delete the server profile template.
  • B. The server hardware must be powered off.
  • C. Rename the server profile.
  • D. Reboot the HPE OneView appliance.

Answer: B

 

NEW QUESTION 126
When creating a Server Profile Template, what are advantages or creating an unassigned Ethernet type connection during template creation? (Choose two.)

  • A. Template creation is the only time that new network adapters can be created
  • B. It eliminates the need to power off the server when adding connectivity to the production networks or disabling a profile connection
  • C. It avoids re-enumeration when assigning a network to existing connections
  • D. It enables auto-zoning of SAN connections

Answer: B,C

 

NEW QUESTION 127
Before applying server profiles to a group of servers. What is the first thing you should check?

  • A. The servers are powered down.
  • B. The servers are all the same server hardware type.
  • C. The servers have the correct firmware installed.
  • D. The servers are all Synergy compute modules.

Answer: B

 

NEW QUESTION 128
......